Ashford Holdings PVT L.T.D

Ashford Holdings PVT L.T.D

Engineering Air. Enhancing Lives.

About Ashford Holdings PVT L.T.D

Engineering Air.
Enhancing Lives.

Ashford Holdings PVT L.T.D delivers ventilation, air conditioning, purification, Kitchen ESP and HVLS fan solutions across Sri Lanka.

One team for the whole air path.

Our work spans ventilation, air purification, cooling and air conditioning, kitchen exhaust filtration, ducting and dust extraction.

HVLS fans bring gentle, wide-area circulation to factories, warehouses and commercial spaces, helping improve comfort and air distribution.

  • 01Air Conditioning & Ventilation
  • 02Air Purification & Filtration
  • 03Kitchen ESP
  • 04Dust Extraction
  • 05HVLS Fan
Gayan Wickramarathne

Ashford Holdings PVT L.T.D

Gayan Wickramarathne

Our commitment to you

Better air.
Lasting relationships.

At Ashford Holdings, we believe good engineering begins with understanding the people and spaces we serve.

Every workplace has its own challenges. Our approach brings together careful planning, practical solutions and attention to detail to create environments where people can work comfortably and confidently.

From ventilation and cooling to air purification and extraction, we focus on solutions that suit each client's needs. Clear communication, responsible workmanship and dependable support guide the way we work.

Thank you for considering Ashford Holdings. We look forward to working with you and building a lasting relationship based on trust and care.

Gayan Wickramarathne

Ashford Holdings PVT L.T.D

Vision

The nation's most sought after ‘Environment Comfort’ engineering company.

Mission

Ashford Holdings PVT L.T.D will lead the field in Sri Lanka by 2032 and will effect a positive change in the lives of millions.

Values

  • 01Trust
  • 02Accountability
  • 03Integrity
  • 04Loyalty

Every system follows the air.

Ashford Holdings PVT L.T.D engineers the complete air path, not a single piece of equipment. Follow it through a building, stage by stage.
LEVEL 02LEVEL 01AINTAKEBFILTRATIONCCONDITIONINGDDISTRIBUTIONEKITCHEN ESPFEXTRACTION
Cross-section of a building showing air entering through an intake, passing filtration and conditioning in rooftop plant, being distributed to two floors, monitored by sensors and extracted through a rooftop fan.

Stage A · 01 / 06

Air intake

Outdoor air is drawn through louvred intakes positioned clear of discharge points and contamination sources.

Ventilation

How a project runs.

Survey, engineer, select, fabricate, install, commission, one accountable team from first visit to handover.
  1. 01

    Survey

    Site, process, occupancy and existing plant are assessed before anything is specified.

  2. 02

    Engineer

    Airflow, heat load, pressure and filtration requirements are calculated and drawn.

  3. 03

    Select

    Equipment is matched to the calculated duty from established manufacturers.

  4. 04

    Fabricate

    Ductwork, canopies, supports and assemblies are fabricated to drawing.

  5. 05

    Install

    Mechanical, electrical and controls interfaces are installed and assembled on site.

  6. 06

    Commission

    Systems are tested, balanced and handed over with documentation and support.

Working with businesses
across Sri Lanka.

We work with the Sri Lankan operations of local and international brands, delivering engineering solutions for factories, hospitals, hotels, retail spaces and commercial facilities.

Why
Ashford Holdings PVT L.T.D

  1. 01

    Integration

    Ventilation, air conditioning, purification, Kitchen ESP, dust extraction and HVLS fans from one engineering team, designed as one system, not five contracts.

    Five disciplines, one team

  2. 02

    Precision

    Systems are surveyed, calculated and drawn around the actual process, occupancy and building before equipment is selected.

    “Completed to our exacting standards”, Variosystems

  3. 03

    Reliability

    Delivery that holds to programme across Sri Lanka and overseas, including multi-country coordination.

    “Installed ahead of time”, DOK Solutions Lanka

  4. 04

    Partnership

    Long-term relationships built on post-installation support and continual improvement in energy efficiency.

    “For over 15 years, we have relied on their expertise”, CBL

Start a project

Ready to engineer
better air?

Tell us about your facility, project or engineering requirement.